Pyeston
1 turbine | 77m to blade tip | 500kW

Developed solely by Lomond Energy, Pyeston wind turbine was granted planning permission by Fife Council in December 2016.
Lomond Energy managed the project from feasibility, through the screening stage and throughout the planning application stage to consent. There were no statutory objections to the proposal.
The site is located within arable farmland, but would take little land our of production having a relatively small footprint and nearby access to the public road.
Key facts
Location
Glenrothes, Fife
Status
Planning permission granted December 2016 (not built)
Benefits
- Diversification of local farm income.
- 1.2m units of carbon-free electricity annually, equivalent to the consumption of around 250 homes.
Structure
Developed by Lomond Energy