Craigannet
1 turbine | 100m to blade tip | 1.5MW

Lomond Energy secured planning permission for the Craigannet Wind Turbine in August 2015 and was built and now owned by Clean Earth Energy.
The turbine is carefully located to integrate well with existing windfarms in the area whilst making use of a forestry access track nearby to minimise environmental impacts during construction and maximise use of existing infrastructure.
Key facts
Location
Craigannet Farm, Carron Valley, Stirling
Status
Operational since March 2017
Benefits
- New income stream for local landowner
- 4.6m units of carbon-free electricity annually, equivalent to the consumption of around 1,000 homes
Structure
Developed by Lomond Energy for Clean Earth Energy